CRH First Floor - Planned Location of Services
1. Medicine Bed Base
Ward 6 is currently the location of our cardiology services who will be moving down onto ward 5. Ward 6 will remain as a medical bed base - speciality to be confirmed
Ward 2 is currently the location of our MAU. Ward 2 will remain as a medical bed base - speciality to be confirmed
2. Porters, Chapel, Patient Flow, General Office and WADU
The chapel, WADU and porters teams will be remaining in their current location.
3. Agile Admin
A newly refurbished agile office area will be developed; this area will be accessible for all and will promote a hot desking style of working.
Start date: Summer 2025
Completion date: Autumn 2025
4. Accommodation and Agile Admin
This area is currently used for accomodation, changing areas and offices. It will be redeveloped into newly refurbished agile office area. This area will be accessible for all and will promote a hot desking style of working.
The accomodation and changing areas will remain at CRH but in a new location
Start date: TBC
Completion date: TBC
5. CRH Estates and Facilities Management
CRH Estates and Facilities Management will be remaining in its current location.
6. Radiology
Radiology will be remaining in its current location.
7. Orthopaedic Outpatients / Fracture Clinic
The Orthopaedic Outpatients team will be returning back to the CRH site (temporarily based at HRI).
Start date: TBC
Completion date: TBC
8. Medical and Surgical SDECs
The Medical and Surgical SDECs will be situated in the current A&E at CRH.
Start date: TBC
Completion date: TBC
9. Discharge Suite
The space which is currently used for A&E will be redeveloped into a discharge lounge and SDECs with A&E moving into the new clinical build.
Start date: 2029
Completion date: 2029
10. Accident and Emergency
Our new state of the art A&E will be based within the new clinical build.
Start date: TBC
Completion date: TBC
11. Stroke Ward
A 28 bed acute stroke unit will be based at CRH within the new clinical build. Stroke patients who are recieving rehabilitation will be based at HRI.
Start date: TBC
Completion date: TBC
12. Learning Centre (Located on Dryclough Close) COMPLETED FEBRUARY 2025
Now fully open, our staff and learners are able to access the new Learning Centre from Dryclough Lane. The two storey, flat-roofed building has been designed to complement the surrounding area and includes a solar panel system to provide a sustainable electricity source, as part of our aim to deliver an energy efficient building.
The aim for the centre is that is becomes a hub for our staff to learn, grow and develop. It has a new clinical simulation suite where a wide range of healthcare professionals can be trained and practise realistic scenarios and hone new skills. There are also flexible and interactive education and teaching spaces for team and individual learning, breakout areas, as well as a new library.
"It's an absolutely amazing space" - new Learning Centre handed over ahead of opening - CHFT Future
Page last updated: 14/05/2025
This information is for Trust staff. It is being updated as work on Calderdale Royal takes shape and should not be used for wayfinding around the site.